Digital X-ray radiography system Site planning
Perfection in Quality beyond your imaginatio
Site planning will be an aid to customer easy understanding Samsung healthcare standard layout and determine your own space.
-
Sales team consult purchasing information and clinical information.
www.samsunghealthcare.com -
Please contact site plan center when you need roomlayout or site planning information
email siteplan@samsung.com
Tel +82.2.2194.1253
- It must be consulted with the person who in charge of installation samsung healthcare.
- Radiation protection is needed that meet national or local code.
- Radiation protection should be specified by Qualified Radiological physicist.
Perspective Room Layout
Video
Standard Layout
Perspective Room Layout
-
Ambient operation temperature
10°C ~ 40°C -
Ambient operation humidity
30 ~ 75 % NON CONDENSING -
Ambient operation pressure
70kPa ~ 106kPa v
| ITEM | ITEM NAME |
|---|---|
| 1 | PATIENT TABLE |
| 2 | WALL STAND |
| 3 | GENERATOR |
| 4 | CEILING RAIL |
| 5 | CEILING-MOUNTED TUBE HEAD |
| 6 | WORK STATION |
| 7 | CIB |
| 50 | LEAD SHIELD DOOR |
| 51 | X-RAY WARNING ON LAMP WHEN EXPOSURE |
| 52 | DOOR SWITCH |
| 53 | LEAD GLASS |
| 54 | LEAD SHIELDED WALL |
| 55 | POWER DISTRIBUTION |
| 56 | COUNTER TOP FOR WORKSTATION |
| ITEM | WEIGHT | HEAT OUTPUT | LOCATION |
|---|---|---|---|
| 1 | 200kg | 600W | FLOOR FINISH. |
| 2 | 150kg | 150W | FLOOR FINISH. |
| 3 | 100kg | 3.460W | FLOOR FINISH. |
| 4 | N/A | 0W | CEILING FINISH. |
| 5 | 280kg | 560W | CEILING FINISH. |
| 6 | N/A | 0W | CONTROL RM. |
| 6 | N/A | N/A | CONTROL RM. |
| 50 | DOOR | ||
| 51 | DOOR | ||
| 52 | DOOR | ||
| 53 | EXAM ROOM | ||
| 54 | EXAM ROOM | ||
| 55 | EXAM ROOM | ||
| 56 | CONTROL RM. |
| ITEM | ITEM NAME | WEIGHT | HEAT OUTPUT | LOCATION |
|---|---|---|---|---|
| 1 | PATIENT TABLE | 210kg | 640W (2,183.7 BTU) | FLOOR FINISH |
| 2 | WALL STAND | 180kg | 800W (2,729.6 BTU) | FLOOR FINISH |
| 3 | GENERATOR CABINET (W/HVG) | 120kg | 277.78W (947.82 BTU) | FLOOR FINISH |
| 4 | CEILING RAIL | N/A | 0W (0 BTU) | CEILING FINISH |
| 5 | CEILING-MOUNTED TUBE HEAD UNIT | 390kg | 800W (2,729.6 BTU) | CEILING FINISH |
| 6 | WORK-STATION | N/A | 400W (1,364.8 BTU) | CONTROL RM. |
| 7 | CIB | N/A | N/A | CONTROL RM. |
| 50 | LEAD SHIELD DOOR | DOOR | ||
| 51 | X-RAY WARNING ON LAMP WHEN EXPOSURE | DOOR | ||
| 52 | DOOR SWITCH | DOOR | ||
| 53 | LEAD GLASS | EXAM ROOM | ||
| 54 | LEAD SHIELDED WALL | EXAM ROOM | ||
| 55 | POWER DISTRIBUTION | EXAM ROOM | ||
| 56 | COUNTER TOP FOR WORKSTATION | CONTROL RM. |
□ CUSTOMER / CONTRACTOR SUPPLIED AND INSTALLED ITEMS
Power requirement
-
Voltage
3-phase
Europe, Asia 400VAC ± 10%, 50~60 Hz
US 480VAC ± 10%, 50~60 Hz
Single phase
Europe, Asia 230VAC ± 10%
US 120VAC ± 10%
-
Wire Configuration
3 wire power and ground(without Neutral)
-
Circuit breaker
Europe, Asia 3 pole, 125A
US 3 pole, 100A